PING PONG

Written by admin

THE EXISTING INSTALLATION

FINAL TESTS

HARDWARE TESTS

Designing our custom font
Testing different LED strips
LED strip to screen
Testing morse code
Mapping LED adresses
Dead pixel tests

For this project I had to completely redo all the technology and keep the functionality the same.


I did:
– project management
– programming every single line of code
– ordering materials
– testing different products
– building all the hardware components
– installing them at the location
– wiring everything low to high voltage.

Leave a Reply